Hydroseeding & Erosion Control

Bare ground,
made green.

Residential lawns and commercial sites, seeded in a single pass and built to hold through the next hard rain.

931-434-9536

About 2 minutes. Send photos, no site visit needed to start.

  • Residential
  • Commercial
  • Tullahoma, TN

Seed, mulch, and fertilizer go down together in one even spray. It grips the soil, holds moisture, and turns bare dirt into lawn in weeks, not seasons.

Faster and more even than seeding by hand, and far less than laying sod across a whole property.

For builders and developers, it’s a cost-efficient way to plant grass, control erosion and stabilize soil across Middle Tennessee.

What we do

Four services. One goal: grass that holds.

Hydroseeding

A sprayed mix of seed, mulch and fertilizer that sticks to the soil and sprouts fast. Built for new yards and big bare areas.

Best for: new builds

Erosion control

Holds soil in place on slopes, ditches and job sites through the next big rain.

Best for: washouts

Lawn restoration

Brings thin, patchy or damaged lawns back to full, even coverage.

Best for: patchy lawns

Core aeration & overseed

Pulls small plugs to loosen packed soil, then adds new seed where roots can reach it.

Best for: packed soil

Why hydroseed is the best

Hydroseed vs sod vs seed & straw
Hydroseeding compared with sod and with seed and straw
HydroseedOur pickSodSeed & straw
Upfront costMidHighestLowest
Time to greenAbout 1 to 2 weeks to sproutInstant2 to 4 weeks, often patchy
Holds on slopesMulch locks soil from day oneGood once rootedSeed washes off in hard rain
Best forBig areas, new builds, slopesSmall areas needing instant greenSmall touch-ups

General guidance; results vary with season, soil and watering.

Seed. Water. Grow.

Seed.

A blend chosen for your sun, shade and soil.

Water.

The mulch holds moisture, so seed stays damp between waterings.

See the watering guide
Grow.

First green in about one to two weeks, with a simple watering plan.

From call to green

  1. Day 1

    Send photos or call

    Tell us what you’re seeing: bare dirt, washouts, thin grass.

  2. Days 2 to 5

    Visit and quote

    We measure, check soil and slope, and send a written estimate.

  3. Seed day

    One-pass spray

    Seed, mulch, and fertilizer go down together. You get a watering plan.

  4. Week 1 to 2

    First green

    Sprouts push through the mulch. Keep it moist.

  5. Week 4 or so

    Ready to mow

    A full, even lawn that holds when the rain comes.

Real example: a Bermuda yard sprayed May 17 was established by June 9, helped by a rainy month. Timing varies with season, soil and rain.

See the full care guide

Recent work

See all projects
Seed day, May 17: a new build with the whole yard freshly sprayed in blue-green hydroseed mulchSeed day · May 17
June 9: the same property with a thick, mowed Bermuda lawnJune 9
New build, Bermuda lawnHydroseedingResidentialEstablished in about 3 weeks

Service area

Based in Tullahoma, 37388, working about 50 miles out across Middle Tennessee and into north Alabama. Including:

  • Tullahoma
  • Manchester
  • Shelbyville
  • Winchester
  • Lynchburg
  • Fayetteville
  • Estill Springs
  • Decherd
  • Wartrace
  • Monteagle
ALABAMATims Ford LakeI-24MurfreesboroMcMinnvilleShelbyvilleManchesterLewisburgWinchesterFayettevilleHuntsville50-mile radiusTULLAHOMA37388Simplified map, not to survey scale.

Ready when the ground is.

Your lawn, our seed. Let’s grow together.

CallStart my estimate